KELINRUIER

40 Registered Capital(Million)

The gathering and transportation system of the Southern Oilfield has been in service for an extended period. Influenced by factors such as the regional environment, climate, internal conveying medium, and pipe material, inspections and investigations have revealed varying degrees of corrosion thinning in some pipelines. The safety hazards associated with these pipelines are becoming increasingly prominent, posing a significant constraint on production. Moreover, pipeline leaks could lead to environmental pollution incidents, resulting in adverse impacts. To ensure the safe operation of the pipelines, internal lining repair is being implemented on those identified with safety risks. This project involves trenchless repair of a total of 20.89 km of pipeline.

Shandong Kelinruier Pipeline Engineering Co. Ltd

Add:Floor 17, Weiyang SOHO, Wanda Times Square, Huanghe Road, Dongying District, Dongying City, Shandong Province

Tel:+86-546-8179588

WeChat

Copyright© 2014Shandong Kelinruier Pipeline Engineering Co. Ltd    备案号:鲁ICP备11005134号-1     Support:www.546dns.cn     Sitemap