Shenyang Project

Shenyang Project Engineering Instruction
Shenyang water supply pipe network reconstruction engineering - Zhaogong Street lining HDPE pipeline repair engineering: the HDPE lining pipe is inserted into DN700 cement pipe, with the total length of 5,900m. Phase I engineering was started in September 2012 and completed in December 2012. The engineering is qualified after completion acceptance.


Guilin Project

Guilin Project Description:
Guilin south area and east area water supply pipeline network project Guiyang road pipeline lining project, DN500 cement pipes lining HDPE pipes, overall length of 12,000 meters, started in February 2011, which lasted 115 days. After completion and acceptance, project quality is qualified.